-
A6 Randalstown to Castledawson Dualling Road scheme pre-works LIDAR
Pre-works LIDAR survey of the topography on the line of the proposed road. -
A26 Dualling LIDAR
The LIDAR data encompassed the 8km scheme area along the existing A26 carriageway. The LIDAR survey was carried out to detect archaeological features such as the remains of... -
Bathymetric LiDAR for Red Bay
Small test site for combined bathymetric and topographic LiDAR in Red Bay, surveyed January 2006. Data were tidally corrected using UK Hydrographic Office "Total Tide" software... -
Bathymetric LiDAR for small area of Strangford Lough
Small test site for combined bathymetric and topographic LiDAR in Strangford Lough, surveyed January 2006. Data were tidally corrected using UK Hydrographic Office "Total Tide"...